Boiler drum production. In a production facility, an accurate estimate of man-hours needed to complete a task is required. A manufacturer of boiler drums used regression to predict the number of man-hours needed to erect the drums in future projects. To accomplish this, data for 35 boilers were collected. In addition to man-hours (y), the variables measured were boiler capacity 1×1 = lb/hr2, boiler design pressure (x2 = pounds per square inch or psi), boiler type (x3 = 1 if industry field erected, 0 if utility field erected), and drum type (x4 = 1 if steam, 0 if mud). The data are saved in the file. (The first five and last five observations are listed in the accompanying table.)

a. Fit the model E(y) = 0 + 1x1 + 2x2 + 3x3 + 4x4 to the data. Give the estimates of the ’s.

b. Conduct a test for the global utility of the model. Use a = .01.

c. Find a 95% confidence interval for E(y) whenx1 = 150,000, x2 = 500, x3 = 1, and x4 = 0. Interpret the

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"
Looking for a Similar Assignment? Our Experts can help. Use the coupon code SAVE30 to get your first order at 30% off!

Hi there! Click one of our representatives below and we will get back to you as soon as possible.

Chat with us on WhatsApp